Bullet train plan gains speed

Bullet train plan gains speed

Prime Minister Narendra Modi and his Japanese counterpart Shinzo Abe will lay the foundation of the Rs 98,000-crore Mumbai-Ahmedabad high-speed rail corridor during the latter’s visit to India in September.

The bullet train project will be based on Japanese high-speed technology called Shinkansen, which is known for its safety and comfort. The high-speed train will cover the 508 km between Mumbai and Ahmedabad in two hours, down from seven hours now.

The two countries are expected to sign a loan agreement during Abe’s visit between September 12 and September 14. In February 2016, a special purpose vehicle – National High Speed Rail Corporation – was formed to implement the elevated rail corridor project.

The Japanese government has agreed to provide a loan of up to 81 per cent of the project cost, or $12 billion, at 0.1 per cent interest per annum to be repaid in 50 years with a 15-year moratorium, according to sources. The project was sanctioned with a 50 per cent equity participation by the railway ministry and 25 per cent each by the governments of Maharashtra and Gujarat.

India has long been contemplating a high-speed railway network but has been daunted by the high costs involved. The construction of the 500km bullet train link will begin in 2018-end and should be operational by 2023. The originating station in Mumbai will be at the Bandra Kurla Complex. There will be 12 stations on the route.

For detailed designing of the project, Japan has appointed a consortium of consultants led by Japan International Consultants for Transportation, Nippon Koie Group and Oriental Structures. The joint feasibility study was done in 2015, and after that follow-up studies were conducted to finalise standards and specifications for the project.

In addition to the Mumbai-Ahmedabad high-speed corridor, five corridors are being explored; Delhi-Mumbai, Mumbai-Chennai, Delhi-Calcutta, Delhi-Nagpur and Mumbai-Nagpur corridors. Trains on these corridors will run at speed of over 300 kmph.

About author

TnH Global
TnH Global 3870 posts

Our platform is the most comprehensive, current and accurate content destination for tourism that also offers the opportunity to connect and network with quality buyers and sellers.

Name: TnH Global              Email: admin@tnhglobal.com

You might also like

Latest

Sands China Ltd. scoops top honours for The Parisian Macao Grand opening at Marketing Events Awards 2017

Huge creative and logistical project for newest addition to Sands Resorts Macao recognised at key industry ceremony. Sands China Ltd. has won the prestigious Best of Show – Brand award at The

Latest

Indian Railways launches new train services from Bhubaneswar and Bhopal

The Indian Railways on Thursday launched two train services from Bhubaneswar and Bhopal to cater to growing demand of passengers from the region. The weekly ‘Humsafar Express’ was pressed into

Latest

India to provide $31 million support for rural aviation scheme says Jayant Sinha

India launched the Regional Connectivity Scheme to get more people flying in what is already the world’s fastest growing aviation market. India’s Minister of State for Aviation Jayant Sinha said

0 Comments

No Comments Yet!

You can be first to comment this post!